NFPA 70B in Practice
Turn NFPA 70B from a thick standard into an electrical maintenance program you can run, prove and improve. Equipment lasts longer, outages drop and audits become routine. For data centers and critical facilities.
Built for the people who own electrical maintenance
Leave with a working draft of the maintenance program for your own site, and the confidence to defend it in front of an insurer or inspector.
No engineering degree needed. Just working familiarity with electrical rooms and equipment names. NFPA offers free read only access to the standard, so you can look up the exact wording as you go.

Practice on Bayou DC, build for your site
One realistic case runs through every unit. Practice each step on it, then repeat the step on your own site.
Bayou DC site pack
A realistic Houston colocation site with the documents a real program coordinator inherits.
- Single line diagram with two deliberate errors
- Equipment list for about 60 assets
- Panel schedules and arc flash labels, one from an outdated study
- Two years of good and weak test reports
- A deficiency list with items never closed
- An insurer recommendation letter
- Photos of equipment in good, fair and poor condition
Your program and templates
A draft program for your own site, a 90 day rollout plan, a verified skills record and the templates to keep it running.
- Program cover document
- Asset register
- Condition assessment worksheet
- Maintenance and test record
- Deficiency log
- Roles and qualifications table
- Test report review checklist
- 90 day rollout plan
- KPI sheet
Course units
Ten units in three parts, about 5 hours of short video plus about 4 hours of exercises. Each unit has a Bayou DC exercise, a build your own step and a quiz.

Set up the program
Why the standard matters now, what a program must contain, and a complete picture of your electrical system.
Start here
What the course is and is not, how to read the standard for free, and a scored self assessment of your own site.
Why 70B Matters Now
From recommended practice to standard, who can hold your site to it, and what poor maintenance costs.
The Electrical Maintenance Program
How NFPA 70, 70E and 70B fit together, and the parts every program needs.
Know What You Have
A complete, current picture of the system, from asset register to arc flash labels.

Condition and maintenance
Rate equipment condition, let it set the schedule, and get the right people doing the work safely.
Equipment Condition Assessment
The core skill: physical condition, criticality and environment set how often each asset is maintained. The heart of the course.
Maintenance Activities by Equipment
What gets done, by whom and how often, for every equipment family in a data center.
People and Safety
Qualified people, training records and where 70B maintenance meets 70E safe work practice.

Prove it and run it
Records that prove the work, the outside parties who judge it, and a program that runs itself.
Records and Closing the Loop
Prove the program runs: good test records, a deficiency log and an annual review.
Contractors, Insurers and Inspectors
Scope a testing contract, review a test report and answer an insurer recommendation.
Launch and Run the Program
Go from draft to a living program with a 90 day rollout, a budget case and KPIs.
Technology in the Program
Optional: how monitoring, sensors and robotic rounds supply condition evidence between scheduled tasks. They complement required testing, never replace it.
How you learn
Most 70B courses walk through the chapters. This one builds the program alongside you.
Build, don’t just learn
Every unit ends with you adding one piece to your own program. By Unit 9 the draft is done.
Condition drives everything
Condition assessment is the heart of the modern 70B, so it gets the most practice of any skill in the course.
Evidence is the product
A program nobody can prove does not exist. Every unit asks what record would show an insurer the work was done.
Plain words, the real standard
We explain what the standard requires in our own words and show you exactly where to look for the precise text.
Real consequences
One short, anonymized case per unit: a missed test, a stale single line diagram, an arc flash label from an old study.
AI coach and program builder
A coach that checks each piece you build and plays the auditor, plus a builder that turns your ratings into a draft schedule.
Capstone and skills record
About 2 hours, three parts. Passing earns a verified skills record you can share.
Scope and roles, an asset register for 25 critical assets with condition ratings, a schedule framework tied to the standard, a record list and a 90 day plan.
Find the gaps planted in another site’s program, from a stale study to deficiencies never closed.
The AI coach plays a risk engineer and asks six evidence questions. Answer from your own documents.
Where to go next
The course prepares you for recognized programs. Accredited providers remain responsible for certification.
Scope
Supplemental training on how to build and run an electrical maintenance program. It does not qualify anyone to perform electrical testing or energized work, sign off an inspection or certify compliance. Testing, energized work and condition assessments need qualified persons with task specific training, field experience and calibrated equipment. The adopted edition of the standard and the authority having jurisdiction always have the final word. We describe what NFPA 70B requires in our own words and never reproduce its tables, interval values or text. The skills record is not a certification.
See all offerings. NFPA 70B is a registered trademark of the National Fire Protection Association; this course is independent and not affiliated with or endorsed by NFPA. FacilityOps AI is a d/b/a of RoboSkill Inc., Houston, Texas.